Calumet, WI interconnection queue

2 active projects totaling 2,414.3 MW in the MISO queue, plus 12 with terminal status (shown grayed).

2active projects
2,414.3active MW
14total filed
Queue IDProjectkVMWResourceStatus
E0016 Not reported n/r 1,211.3 Gas Active
J4014 Not reported n/r 1,203 Gas Active
J336 Not reported 345 845 Gas Withdrawn
J335 Not reported 345 551 Gas Withdrawn
G102 Not reported n/r 530 Other Withdrawn
G152 Not reported n/r 530 Other Withdrawn
J1775 Not reported 345 150 Solar Withdrawn
J3332 Not reported 345 150 Wind Withdrawn
G977 Not reported 138 101 Wind Withdrawn
G611 Not reported 138 99 Wind Withdrawn
G590 Not reported 138 98 Wind Withdrawn
G334 Not reported n/r 80 Wind Withdrawn
H090 Not reported 138 60 Wind Withdrawn
G927 Not reported 138 2 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.