Callaway, MO interconnection queue

4 active projects totaling 906 MW in the MISO queue, plus 7 with terminal status (shown grayed).

4active projects
906active MW
11total filed
Queue IDProjectkVMWResourceStatus
G733 Not reported n/r 1,650 Nuclear Withdrawn
J1836 Not reported n/r 300 Solar Active
J2043 Not reported 345 300 Solar Withdrawn
J2205 Not reported 345 300 Hybrid Active
J3307 Not reported n/r 300 Solar Withdrawn
J1145 Not reported 345 250 Solar Active
J1965 Not reported 345 150 Solar Withdrawn
J2121 Not reported 345 100 Solar Withdrawn
J994 Not reported 161 100 Solar Withdrawn
J2008 Not reported 345 65 Battery Withdrawn
G475 Not reported n/r 56 Nuclear Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.