Calhoun, AR interconnection queue
3 active projects totaling 1,060 MW in the MISO queue, plus 6 with terminal status (shown grayed).
3active projects
1,060active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J2395 | Not reported | 500 | 500 | Solar | Active |
| J2785 | Not reported | 500 | 500 | Solar | Withdrawn |
| J3386 | Not reported | 500 | 500 | Solar | Withdrawn |
| J2396 | Not reported | 500 | 400 | Solar | Active |
| J3388 | Not reported | 500 | 400 | Solar | Withdrawn |
| J3711 | Not reported | 500 | 400 | Solar | Withdrawn |
| J2640 | Not reported | 500 | 394.5 | Solar | Withdrawn |
| J3567 | Not reported | 500 | 200 | Battery | Withdrawn |
| J2397 | Not reported | 500 | 160 | Hybrid | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner