Home / MISO / Counties / Butler, OH
Butler, OH interconnection queue
2 active projects
totaling 92 MW in the MISO queue, plus 4 with terminal status (shown grayed).
2 active projects
92 active MW
6 total filed
Queue ID Project kV MW Resource Status
G098
Not reported
n/r
165
Other
Withdrawn
J120
Not reported
138
134.5
Gas
Withdrawn
G941
Not reported
69
67
Other
Operational
G094
Not reported
n/r
30
Other
Withdrawn
G837
Not reported
n/r
25
Coal
Operational
J210
Not reported
69
20
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with MISO before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.