Burleigh, ND interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
G861 Not reported n/r 960 Wind Withdrawn
G860 Not reported n/r 900 Wind Withdrawn
J580 Not reported 230 298 Wind Withdrawn
J940 Not reported 345 100 Wind Withdrawn
J178 Not reported 115 99.6 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.