Buchanan, IA interconnection queue

2 active projects totaling 400 MW in the MISO queue, plus 7 with terminal status (shown grayed).

2active projects
400active MW
9total filed
Queue IDProjectkVMWResourceStatus
G220 Not reported n/r 650 Other Withdrawn
G181 Not reported n/r 600 Gas Withdrawn
G182 Not reported n/r 600 Gas Withdrawn
G159 Not reported n/r 500 Other Withdrawn
J1341 Not reported 345 398 Wind Withdrawn
J342 Not reported 345 305 Wind Withdrawn
J2545 Not reported n/r 200 Battery Active
J3780 Not reported n/r 200 Battery Active
G653d Not reported n/r 23.3 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.