Brown, WI interconnection queue

2 active projects totaling 95 MW in the MISO queue, plus 9 with terminal status (shown grayed).

2active projects
95active MW
11total filed
Queue IDProjectkVMWResourceStatus
G086 Not reported n/r 600 Other Withdrawn
G524 Not reported n/r 600 Gas Withdrawn
J294 Not reported 138 588 Gas Withdrawn
G131 Not reported n/r 500 Other Withdrawn
G987 Not reported 345 400 Wind Withdrawn
G001 Not reported n/r 255 Other Withdrawn
J2211 Not reported n/r 200 Battery Withdrawn
G773 Not reported 138 150 Wind Withdrawn
G111 Not reported n/r 85 Coal Operational
G421 Not reported 69 50 Wind Withdrawn
G322 Not reported n/r 10 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.