Blue Earth, MN interconnection queue

4 active projects totaling 1,222 MW in the MISO queue, plus 4 with terminal status (shown grayed).

4active projects
1,222active MW
8total filed
Queue IDProjectkVMWResourceStatus
G261 Not reported n/r 667 Gas Operational
G407 Not reported n/r 667 Gas Withdrawn
J4017 Not reported 345 299 Solar Active
J073 Not reported n/r 194 Gas Withdrawn
J4087 Not reported n/r 183 Battery Active
G828 Not reported 345 76 Wind Withdrawn
J299 Not reported n/r 73 Gas Operational
G617 Not reported 69 50 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →