Big Stone, MN interconnection queue

3 active projects totaling 850 MW in the MISO queue, plus 5 with terminal status (shown grayed).

3active projects
850active MW
8total filed
Queue IDProjectkVMWResourceStatus
J3384 Not reported 345 300 Wind Active
J3672 Not reported 345 300 Wind Active
J3443 Not reported n/r 250 Hybrid Active
G668 Not reported n/r 100 Wind Withdrawn
J596 Not reported 115 100 Wind Withdrawn
G792 Not reported n/r 50 Wind Withdrawn
G894 Not reported 115 49.5 Wind Withdrawn
G630 Not reported 41.6 21 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.