Substation Scout

Beltrami, MN interconnection queue

1 active project totaling 50 MW in the MISO queue, plus 2 with terminal status (shown grayed).

1active projects
50active MW
3total filed
Queue IDProjectkVMWResourceStatus
J064 Not reported 115 100 Wind Withdrawn
G059 Not reported n/r 50 Gas Operational
H101 Not reported 115 50 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.