Substation Scout

Barry, MI interconnection queue

1 active project totaling 150 MW in the MISO queue.

1active projects
150active MW
1total filed
Queue IDProjectkVMWResourceStatus
J2129 Not reported 138 150 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.