Avoyelles Parish, LA interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 5 with terminal status (shown grayed).

1active projects
200active MW
6total filed
Queue IDProjectkVMWResourceStatus
J3170 Not reported 138 200 Solar Active
J3581 Not reported 138 200 Battery Withdrawn
J2290 Not reported 138 130 Hybrid Withdrawn
J3659 Not reported n/r 90.3 Hybrid Withdrawn
J3367 Not reported 138 88 Solar Withdrawn
J664 Not reported n/r 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.