Ascension Parish, LA interconnection queue
0 active projects totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1151 | Not reported | 230 | 252 | Gas | Withdrawn |
| J1685 | Not reported | 230 | 250 | Hybrid | Withdrawn |
| J1618 | Not reported | 230 | 200 | Solar | Withdrawn |
| J2839 | Not reported | 230 | 200 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.