Substation Scout

Arenac, MI interconnection queue

2 active projects totaling 354.5 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
354.5active MW
4total filed
Queue IDProjectkVMWResourceStatus
J2493 Not reported 345 184 Solar Withdrawn
E0007 Au Gres Solar Project 138 179.5 Solar Active
J2876 Not reported 138 175 Solar Active
J2671 Not reported 138 150 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first