Allen Parish, LA interconnection queue

1 active project totaling 125 MW in the MISO queue, plus 3 with terminal status (shown grayed).

1active projects
125active MW
4total filed
Queue IDProjectkVMWResourceStatus
J2083 Not reported n/r 200 Solar Withdrawn
J2527 Not reported 138 140 Battery Withdrawn
J1205 Not reported 138 125 Solar Operational
J692 Not reported n/r 5.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.