Substation Scout

Allegan, MI interconnection queue

4 active projects totaling 819.9 MW in the MISO queue, plus 9 with terminal status (shown grayed).

4active projects
819.9active MW
13total filed
Queue IDProjectkVMWResourceStatus
J4167 Not reported n/r 250 Battery Active
J2889 Not reported 138 200 Battery Active
J579 Not reported 345 200 Wind Withdrawn
J631 Not reported n/r 200 Wind Withdrawn
J3480 Not reported n/r 199.9 Battery Active
J3817 Not reported n/r 175 Battery Withdrawn
J2786 Not reported 345 170 Hybrid Active
J3474 Not reported 138 128 Solar Withdrawn
G647 Not reported 345 102 Wind Withdrawn
J576 Not reported n/r 100 Wind Withdrawn
J059 Not reported 138 99 Wind Withdrawn
H076 Not reported 138 74 Wind Withdrawn
J037 Not reported 138 64.5 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first