Allamakee, IA interconnection queue

2 active projects totaling 280 MW in the MISO queue, plus 5 with terminal status (shown grayed).

2active projects
280active MW
7total filed
Queue IDProjectkVMWResourceStatus
R1018 Replacing 100 MW of existing coal generation with 28 Power Electronic 4.01 MVA at Lansing Generation Station; Lansing 4 161 280 Hybrid Withdrawn
G869 Not reported 161 200 Wind Withdrawn
R1037 Replacing 180MW with BESS of the existing 280 MW Steam; LANSING 4 161 180 Hybrid Withdrawn
R5064 Replacing 150 MW of coal generation with BESS at Lansing; Lansing 4 n/r 150 Battery Active
J3527 Not reported 161 136 Wind Withdrawn
R5065 Replacing 130 MW of coal generation with BESS at Lansing; Lansing 4 n/r 130 Battery Active
J1733 Not reported 161 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.