Allamakee, IA interconnection queue
2 active projects totaling 280 MW in the MISO queue, plus 5 with terminal status (shown grayed).
2active projects
280active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| R1018 | Replacing 100 MW of existing coal generation with 28 Power Electronic 4.01 MVA at Lansing Generation Station; Lansing 4 | 161 | 280 | Hybrid | Withdrawn |
| G869 | Not reported | 161 | 200 | Wind | Withdrawn |
| R1037 | Replacing 180MW with BESS of the existing 280 MW Steam; LANSING 4 | 161 | 180 | Hybrid | Withdrawn |
| R5064 | Replacing 150 MW of coal generation with BESS at Lansing; Lansing 4 | n/r | 150 | Battery | Active |
| J3527 | Not reported | 161 | 136 | Wind | Withdrawn |
| R5065 | Replacing 130 MW of coal generation with BESS at Lansing; Lansing 4 | n/r | 130 | Battery | Active |
| J1733 | Not reported | 161 | 50 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner