Substation Scout

Alcona, MI interconnection queue

3 active projects totaling 451.9 MW in the MISO queue.

3active projects
451.9active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2611 Not reported 138 215 Solar Active
J3451 Not reported 138 120 Solar Active
J3539 Not reported 138 116.9 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first