Crittenden to Morganfield substation interconnection queue

0 active projects totaling 0 MW in the LG&E and KU queue, plus 2 with terminal status (shown grayed).

2 LG&E and KU queue filings name Crittenden to Morganfield as the point of interconnection, all in Union County, KY.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2019-013 Not reported 161 100 Solar Withdrawn
LGE-GIS-2019-019 Not reported 161 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.