Corydon Tap to Green River substation interconnection queue
0 active projects
totaling 0 MW in the LG&E and KU queue, plus 2 with terminal status (shown grayed).
2 LG&E and KU queue filings name Corydon Tap to Green River as the point of interconnection, all in KY.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
LGE-GIS-2019-016
Not reported
161
100
Solar
Withdrawn
LGE-GIS-2019-020
Not reported
161
85
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with LG&E and KU before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.