Queue request LGE-GIS-2021-008 was listed in the LG&E and KU interconnection queue at the end of 2025 as a 500 MW hybrid project in Clark County, IN, according to Berkeley Lab’s queue data file. The filing names Primary: Trimble County bus; Alternate: Trimble to Speed line, SIS Primary changed to: Trimble to Speed line as its point of interconnection. Its status as of December 31, 2025 was “Suspended”, with a proposed online date of June 15, 2026.
| Queue ID | LGE-GIS-2021-008 |
|---|---|
| Project name | Not reported |
| Status (as published) | Suspended |
| Substation | Primary: Trimble County bus; Alternate: Trimble to Speed line, SIS Primary changed to: Trimble to Speed line |
| Point of interconnection | Primary: Trimble County 345 kV bus; Alternate: Trimble to Speed 345 kV line, SIS Primary changed to: Trimble to Speed 345 kV line |
| County | Clark |
| State | IN |
| Voltage | 345 kV |
| Capacity | 500 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2026-06-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Clark, IN: 1 request in the LG&E and KU queue, 1 active totaling 500 MW.
Tracked changes
Not tracked. LG&E and KU rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Louisville Gas & Electric and Kentucky Utilities Energy |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Suspended |
| Study phase (as the queue printed it) | LGIA signed, currently suspended |
| Queue date | 2021-03-22 |
| Components (hybrid) | Solar 500 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.