LG&E and KU request LGE-CS2025-008
LG&E and KU queue ID LGE-CS2025-008
Queue request LGE-CS2025-008 was listed in the LG&E and KU interconnection queue at the end of 2025 as a 17 MW gas project in Trimble County, KY, according to Berkeley Lab’s queue data file. The filing names Trimble County Switching Station, (Unit #8) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2026.
| Queue ID | LGE-CS2025-008 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Trimble County Switching Station, (Unit #8) |
| Point of interconnection | Trimble County Switching Station, 345 kV (Unit #8) |
| County | Trimble |
| State | KY |
| Voltage | 345 kV |
| Capacity | 17 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2026-10-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Trimble, KY: 9 requests in the LG&E and KU queue, 9 active totaling 925 MW.
Tracked changes
Not tracked. LG&E and KU rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Louisville Gas & Electric and Kentucky Utilities Energy |
|---|---|
| Cluster | CS 2025 |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Queue date | 2025-12-18 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.