Union, KY interconnection queue

0 active projects totaling 0 MW in the LG&E and KU queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2019-006 Not reported 69 200 Solar Withdrawn
LGE-GIS-2021-002 Not reported 161 150 Solar Withdrawn
LGE-GIS-2018-004 Not reported 161 120 Solar Withdrawn
LGE-GIS-2019-013 Not reported 161 100 Solar Withdrawn
LGE-GIS-2019-019 Not reported 161 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.