Substation Scout

Mccracken, KY interconnection queue

2 active projects totaling 240 MW in the LG&E and KU queue.

2active projects
240active MW
2total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2021-007 Not reported 161 120 Solar Suspended
LGE-GIS-2021-020 Not reported 161 120 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first