Lyon, KY interconnection queue

1 active project totaling 86 MW in the LG&E and KU queue, plus 2 with terminal status (shown grayed).

1active projects
86active MW
3total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2019-023 Not reported 161 150 Solar Withdrawn
LGE-GIS-2019-010 Not reported 161 100 Solar Withdrawn
LGE-GIS-2017-002 Not reported 161 86 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.