Substation Scout

Fayette, KY interconnection queue

0 active projects totaling 0 MW in the LG&E and KU queue, plus 2 with terminal status (shown grayed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2021-023 Not reported 345 200 Battery Withdrawn
LGE-GIS-2019-022 Not reported 138 75 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first