Clarke, IN interconnection queue

0 active projects totaling 0 MW in the LG&E and KU queue, plus 2 with terminal status (shown grayed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2022-005 Not reported 345 1,400 Hybrid Withdrawn
LGE-GIS-2022-006 Not reported 345 1,000 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.