Boyle, KY interconnection queue

1 active project totaling 100 MW in the LG&E and KU queue.

1active projects
100active MW
1total filed
Queue IDProjectkVMWResourceStatus
LGE-GIS-2021-019 Not reported 69 100 Solar Suspended

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with LG&E and KU before relying on these figures.