Substation Scout

WEST GEORGE WEST SUB substation interconnection queue

2 active projects totalling 81.6 MW in the ERCOT queue.

2active projects
81.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0375 Buck Ranch Solar SLF 69 40.8 Solar SS Completed, FIS Started, No IA
27INR0376 Buck Ranch Storage SLF 69 40.8 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.