2 active projects totalling 81.6 MW in the ERCOT queue.

2active projects
81.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0375 Buck Ranch Solar SLF 69 40.8 Solar SS Completed, FIS Started, No IA
27INR0376 Buck Ranch Storage SLF 69 40.8 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.