Tap Lake Creek Substation (#) – Enloe Switching station (#) Line substation interconnection queue

2 active projects totalling 111.1 MW in the ERCOT queue.

2active projects
111.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
24INR0137 Eagle Springs Solar 138 77.2 Solar SS Completed, FIS Completed, IA
24INR0136 Eagle Springs Storage 138 33.9 Battery SS Completed, FIS Completed, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.