Tap Lake Creek Substation (#) – Enloe Switching station (#) Line substation interconnection queue
2 active projects totalling 111.1 MW in the ERCOT queue.
2active projects
111.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 24INR0137 | Eagle Springs Solar | 138 | 77.2 | Solar | SS Completed, FIS Completed, IA |
| 24INR0136 | Eagle Springs Storage | 138 | 33.9 | Battery | SS Completed, FIS Completed, IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.