Smith, TX interconnection queue

1 active project totalling 200.9 MW in the ERCOT queue.

1active projects
200.9active MW
1total filed
Queue IDProjectkVMWResourceStatus
27INR0354 Cebocell BESS 138 200.9 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.