Substation Scout

Real, TX interconnection queue

1 active project totalling 9.9 MW in the ERCOT queue.

1active projects
9.9active MW
1total filed
Queue IDProjectkVMWResourceStatus
23INR0548 Leakey BESS 69 9.9 Battery In Queue

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.