Substation Scout

Real, TX interconnection queue

1 active project totalling 9.9 MW in the ERCOT queue.

1active projects
9.9active MW
1total filed
Queue IDProjectkVMWResourceStatus
23INR0548 Leakey BESS 69 9.9 Battery In Queue

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.