Potter, TX interconnection queue

0 active projects totalling 0 MW in the ERCOT queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
21INR0274 Carol Solar n/r 223.2 Solar Inactive
21INR0363 Carol Battery n/r 168 Battery Inactive
20INR0217 CAROL wind n/r 165.4 Wind Inactive

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.