Substation Scout

Oldham, TX interconnection queue

0 active projects totalling 0 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

0active projects
0active MW
1total filed
Queue IDProjectkVMWResourceStatus
28INR0018 Channing Wind n/r 360.5 Wind Inactive

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.