Morris, TX interconnection queue
1 active project totalling 166 MW in the ERCOT queue.
1active projects
166active MW
1total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 27INR0324 | LONE STAR INDUSTRIAL PARK GAS POWER PROJECT | 138 | 166 | Gas | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.