Montgomery, TX interconnection queue

1 active project totalling 217.2 MW in the ERCOT queue.

1active projects
217.2active MW
1total filed
Queue IDProjectkVMWResourceStatus
27INR0109 Two Barbaras BESS 138 217.2 Battery SS Completed, FIS Started, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.