Substation Scout

Montgomery, TX interconnection queue

1 active project totalling 217.2 MW in the ERCOT queue.

1active projects
217.2active MW
1total filed
Queue IDProjectkVMWResourceStatus
27INR0109 Two Barbaras BESS 138 217.2 Battery SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.