Martin, TX interconnection queue

3 active projects totalling 491.9 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

3active projects
491.9active MW
4total filed
Queue IDProjectkVMWResourceStatus
26INR0247 Jane Storage Energy Center 345 240.6 Battery SS Completed, FIS Started, No IA
25INR0396 Stewart Grady BESS 138 150.5 Battery SS Completed, FIS Started, No IA
25INR0431 Millennium Energy Storage n/r 102.6 Battery Inactive
24INR0275 Picadillo BESS 138 100.8 Battery SS Completed, FIS Completed, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.