Substation Scout

Kerr, TX interconnection queue

1 active project totalling 122.6 MW in the ERCOT queue.

1active projects
122.6active MW
1total filed
Queue IDProjectkVMWResourceStatus
25INR0202 East West BESS n/r 122.6 Battery SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.