Substation Scout

Hamilton, TX interconnection queue

1 active project totalling 0 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

1active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0516 Paolo Sole Hamilton Solar n/r 40.6 Solar Inactive
22INR0596 Grizzly Ridge BESS SLF n/r 0 Battery In Queue

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.