Coryell, TX interconnection queue

1 active project totalling 51.6 MW in the ERCOT queue.

1active projects
51.6active MW
1total filed
Queue IDProjectkVMWResourceStatus
20INR0246 Ryan Energy Storage 69 51.6 Battery SS Completed, FIS Completed, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.