W.S. LEE COMBINED CYCLE STA substation interconnection queue

2 active projects totaling 50 MW in the Duke Energy queue.

2 Duke Energy queue filings name W.S. LEE COMBINED CYCLE STA as the point of interconnection, all in Anderson County, SC.

2active projects
50active MW
2total filed
Queue IDProjectkVMWResourceStatus
956475 Not reported 100 30 Gas Active
978030 Not reported 100 20 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.