West Lake Wales Substation substation interconnection queue
0 active projects
totaling 0 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).
5 Duke Energy queue filings name West Lake Wales Substation as the point of interconnection, all in Polk County, FL.
0active projects
0active MW
5total filed
Queue ID
Project
kV
MW
Resource
Status
13
Not reported
n/r
720
Gas
Withdrawn
17
Not reported
n/r
640
Gas
Withdrawn
14
Not reported
n/r
575
Gas
Withdrawn
16
Not reported
n/r
380
Gas
Withdrawn
227
Not reported
n/r
74.5
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.