Substation Scout

West Lake Wales - Holopaw substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

4 Duke Energy queue filings name West Lake Wales - Holopaw as the point of interconnection, all in Osceola County, FL.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
191 Not reported n/r 74.5 Solar Withdrawn
193A Not reported n/r 74.5 Solar Withdrawn
203A Not reported n/r 74.5 Solar Withdrawn
203B Not reported n/r 74.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first