Weatherspoon substation interconnection queue

1 active project totaling 99 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

3 Duke Energy queue filings name Weatherspoon as the point of interconnection, all in Robeson County, NC.

1active projects
99active MW
3total filed
Queue IDProjectkVMWResourceStatus
PP00026 Not reported n/r 99 Battery Active
2156 Not reported 230 5 Solar Withdrawn
2115 Not reported 230 5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.