Substation Scout

Trenton Substation substation interconnection queue

1 active project totaling 74.9 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).

4 Duke Energy queue filings name Trenton Substation as the point of interconnection, all in FL.

1active projects
74.9active MW
4total filed
Queue IDProjectkVMWResourceStatus
139 Not reported n/r 74.9 Solar Withdrawn
160 Not reported n/r 74.9 Solar Operational
300 Not reported n/r 74.9 Solar Withdrawn
190B Not reported n/r 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first