Substation Scout

Toxaway substation interconnection queue

1 active project totaling 74.9 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

3 Duke Energy queue filings name Toxaway as the point of interconnection, all in Anderson County, SC.

1active projects
74.9active MW
3total filed
Queue IDProjectkVMWResourceStatus
224644 Not reported n/r 74.9 Solar Withdrawn
566202 Not reported 100 74.9 Solar Active
919799 Not reported n/r 45 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first