Suwannee River - FT. White substation interconnection queue
0 active projects
totaling 0 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).
3 Duke Energy queue filings name Suwannee River - FT. White as the point of interconnection, all in Suwannee County, FL.
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
335
Not reported
n/r
74.9
Solar
Withdrawn
339
Not reported
n/r
74.9
Solar
Withdrawn
340
Not reported
n/r
74.9
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.