Ronda substation interconnection queue

0 active projects totaling 0 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

2 Duke Energy queue filings name Ronda as the point of interconnection, all in Wilkes County, NC.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
171806 Not reported 44 21 Solar Withdrawn
565970 Not reported n/r 20 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.