ROBINSON PLANT - ROCKINGHAM substation interconnection queue

2 active projects totaling 149.9 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).

3 Duke Energy queue filings name ROBINSON PLANT - ROCKINGHAM as the point of interconnection, all in SC.

2active projects
149.9active MW
3total filed
Queue IDProjectkVMWResourceStatus
565080 Not reported 230 75 Solar Active
566488 Not reported 230 74.9 Solar Active
564942 Not reported 115 48 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.