Home / Duke Energy / Substations / ROBINSON PLANT - ROCKINGHAM - FLORENCE
ROBINSON PLANT - ROCKINGHAM - FLORENCE substation interconnection queue
1 active project
totaling 48 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).
3 Duke Energy queue filings name ROBINSON PLANT - ROCKINGHAM - FLORENCE as the point of interconnection, all in Chesterfield County, SC.
1 active projects
48 active MW
3 total filed
Queue ID Project kV MW Resource Status
956283
Not reported
230
110
Solar
Withdrawn
956321
Not reported
230
60
Battery
Withdrawn
961214
Not reported
115
48
Solar
Active
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with Duke Energy before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.